Enquire Now
Enquire Now!
I agree to the Terms & Conditions

Brigade El Dorado

Bengaluru - Ongoing

RERA STATUS:

Gallium at Brigade El Dorado: PRM/KA/RERA/1251/472/PR/190427/002540.
Helio at Brigade El Dorado: PRM/KA/RERA/1251/472/PR/190913/002889.
Jasper at Brigade El Dorado: PRM/KA/RERA/1250/303/PR/200618/003458
Feldspar at Brigade El Dorado: PRM/KA/RERA/1251/309/PR/210216/003909
Krypton at Brigade El Dorado: PRM/KA/RERA/1251/309/PR/210518/004158
Iridium at Brigade El Dorado: PRM/KA/RERA/1250/303/PR/200618/003458
Emerald at Brigade El Dorado: PRM/KA/RERA/1251/309/PR/190722/005089
Aurum at Brigade El Dorado: PRM/KA/RERA/1250/303/PR/230623/006018
Luminaire at Brigade El Dorado: PRM/KA/RERA/1251/309/PR/190722/005089
Dioro at Brigade El Dorado: PRM/KA/RERA/1251/309/PR/160224/006634


Available at https://rera.karnataka.gov.in

Overview

A Brigade home is always one of the wisest investments you can make. A home in North Bangalore, just 15 minutes before the International airport, is nothing short of striking gold. Situated within the Aerospace Park, just minutes away from prominent commercial establishments like Shell Technology Centre, proposed Boeing and Rolls Royce offices, IT Parks and many more, the location is known for its clean wide roads, scenic greenery and impeccable infrastructure.

With Brigade El Dorado, the bar has been further raised, and you are invited to a lifestyle that can well be described as the Gold standard of Community Living!

Other downloads

Master plans / Floor plans

Dioro Masterplan

Download

Luminaire Masterplan

Download

Aurum Masterplan

Download

Emerald Masterplan

Download

Iridium Masterplan

Download

Krypton Masterplan

Download

Feldspar Masterplan

Download

Gallium Masterplan

Download

Helio Masterplan

Download

Jasper Masterplan

Download

Status Gallery

Apr 2024 - Emerald Block: Wing C – Milestone Release On Casting Of Sixteenth Floor Slab
Apr 2024 - Emerald Block: Wing C – Milestone Release On Casting Of Sixteenth Floor Slab
Apr 2024 - Emerald Block: Wing C – Milestone Release On Casting Of Sixteenth Floor Slab
Apr 2024 - Emerald Block: Wing C – Milestone Release On Casting Of Sixteenth Floor Slab
Mar 2024 - Luminaire Block: Wing A, B and C
Mar 2024 - Luminaire Block: Wing A, B and C
Mar 2024 - Luminaire Block: Front View - Structure work in progress
Mar 2024 - Luminaire Block: Front View - Structure work in progress
Mar 2024 - Luminaire Block: Wing A - 10th floor level structural work in progress
Mar 2024 - Luminaire Block: Wing A - 10th floor level structural work in progress
Mar 2024 - Luminaire Block: Wing B - 9th floor level structural work in progress
Mar 2024 - Luminaire Block: Wing B - 9th floor level structural work in progress
Mar 2024 - Luminaire Block: Wing C - 11th floor level structural work in progress
Mar 2024 - Luminaire Block: Wing C - 11th floor level structural work in progress
Mar 2024 - Luminaire Block: Toilet waterproofing and plumbing work in progress
Mar 2024 - Luminaire Block: Toilet waterproofing and plumbing work in progress
Mar 2024 - Luminaire Block: Flooring work in progress
Mar 2024 - Luminaire Block: Flooring work in progress
Mar 2024 - Luminaire Block: Toilet dado work in progress
Mar 2024 - Luminaire Block: Toilet dado work in progress
Mar 2024 - Luminaire Block: Putty work in progress
Mar 2024 - Luminaire Block: Putty work in progress
Mar 2024 - Luminaire Block: Balcony flooring and railing work in progress
Mar 2024 - Luminaire Block: Balcony flooring and railing work in progress
Mar 2024 - Luminaire Block: UG sump between tower A & L work in progress
Mar 2024 - Luminaire Block: UG sump between tower A & L work in progress
Mar 2024 - Luminaire Block: East podium between tower A & L work in progress
Mar 2024 - Luminaire Block: East podium between tower A & L work in progress
Mar 2024 - Iridium Block: Service lift - 02 and Passenger lift lobby
Mar 2024 - Iridium Block: Service lift - 02 and Passenger lift lobby
Mar 2024 - Iridium Block: Terrace Tiling
Mar 2024 - Iridium Block: Terrace Tiling
Mar 2024 - Helio Block: Overall Progress North Elevation
Mar 2024 - Helio Block: Overall Progress North Elevation
Mar 2024 - Helio Block: South Elevation
Mar 2024 - Helio Block: South Elevation
Mar 2024 - Helio Block: Wing A, B and C
Mar 2024 - Helio Block: Wing A, B and C
Mar 2024 - Helio Block: Podium
Mar 2024 - Helio Block: Podium
Mar 2024 - Helio Block: Basement
Mar 2024 - Helio Block: Basement
Mar 2024 - Helio Block: South side car parking area
Mar 2024 - Helio Block: South side car parking area
Mar 2024 - Helio Block: MLCP 1 South elevation
Mar 2024 - Helio Block: MLCP 1 South elevation
Mar 2024 - Helio Block: MLCP 1 Terrace
Mar 2024 - Helio Block: MLCP 1 Terrace
Mar 2024 - Helio Block: MLCP 1 Parking Area
Mar 2024 - Helio Block: MLCP 1 Parking Area
Mar 2024 - Gallium Block: GF to 21st Floor Elevation North side
Mar 2024 - Gallium Block: GF to 21st Floor Elevation North side
Mar 2024 - Gallium Block: South Elevation
Mar 2024 - Gallium Block: South Elevation
Mar 2024 - Gallium Block: West and East wing Elevation
Mar 2024 - Gallium Block: West and East wing Elevation
Mar 2024 - Gallium Block: MLCP-1 North Elevation
Mar 2024 - Gallium Block: MLCP-1 North Elevation
Mar 2024 - Gallium Block: MLCP-1 Terrace top view
Mar 2024 - Gallium Block: MLCP-1 Terrace top view
Mar 2024 - Gallium Block: MLCP-2 Terrace top view
Mar 2024 - Gallium Block: MLCP-2 Terrace top view
Mar 2024 - Gallium Block: MLCP 1 Parking Area
Mar 2024 - Gallium Block: MLCP 1 Parking Area
Mar 2024 - Gallium Block: Podium
Mar 2024 - Gallium Block: Podium
Mar 2024 - Gallium Block: G - BASEMENT
Mar 2024 - Gallium Block: G - BASEMENT
Mar 2024 - Gallium Block: South side car parking area
Mar 2024 - Gallium Block: South side car parking area
Mar 2024 - Gallium Block: G Tower Terrace
Mar 2024 - Gallium Block: G Tower Terrace
Mar 2024 - Gallium Block: G tower Ground floor Reception
Mar 2024 - Gallium Block: G tower Ground floor Reception
Mar 2024 - Feldspar Block: Overall Progress
Mar 2024 - Feldspar Block: Overall Progress
Mar 2024 - Feldspar Block: Wing A -  External paint final coat work in progress
Mar 2024 - Feldspar Block: Wing A - External paint final coat work in progress
Mar 2024 - Feldspar Block: Wing B North side - External Painting Final Coat work in progress
Mar 2024 - Feldspar Block: Wing B North side - External Painting Final Coat work in progress
Mar 2024 - Feldspar Block: Wing C - External painting work in progress
Mar 2024 - Feldspar Block: Wing C - External painting work in progress
Mar 2024 - Feldspar Block: Flats Internal Painting and certification work in progress
Mar 2024 - Feldspar Block: Flats Internal Painting and certification work in progress
Mar 2024 - Feldspar Block: Podium area
Mar 2024 - Feldspar Block: Podium area
Mar 2024 - Feldspar Block: Corridor finishing works in progress
Mar 2024 - Feldspar Block: Corridor finishing works in progress
Mar 2024 - Feldspar Block: Basement Painting work in progress
Mar 2024 - Feldspar Block: Basement Painting work in progress
Mar 2024 - Feldspar Block: MLCP - 2 Terrace
Mar 2024 - Feldspar Block: MLCP - 2 Terrace
Mar 2024 - Emerald Block: Overall View
Mar 2024 - Emerald Block: Overall View
Mar 2024 - Emerald Block: East wing
Mar 2024 - Emerald Block: East wing
Mar 2024 - Emerald Block: South wing
Mar 2024 - Emerald Block: South wing
Mar 2024 - Emerald Block: West wing
Mar 2024 - Emerald Block: West wing
Mar 2024 - Emerald Block: Tiling work in progress
Mar 2024 - Emerald Block: Tiling work in progress
Mar 2024 - Emerald Block: Putty and Painting work in progress
Mar 2024 - Emerald Block: Putty and Painting work in progress
Mar 2024 - Aurum Block: STP wall work in progress
Mar 2024 - Aurum Block: STP wall work in progress
Mar 2024 - Aurum Block: Wing A - First floor slab shuttering work in progress
Wing B - Ground floor slab reinforcement work in progress
Wing C - Ground floor slab shuttering work in progress
Mar 2024 - Aurum Block: Wing A - First floor slab shuttering work in progress Wing B - Ground floor slab reinforcement work in progress Wing C - Ground floor slab shuttering work in progress
Mar 2024 - Dioro Block: Wing A - Milestone Release - On Casting of Footing/raft
Mar 2024 - Dioro Block: Wing A - Milestone Release - On Casting of Footing/raft
Mar 2024 - Dioro Block: Wing A - Milestone Release - On Casting of Footing/raft
Mar 2024 - Dioro Block: Wing A - Milestone Release - On Casting of Footing/raft
Mar 2024 - Luminaire Block: Wing A - Milestone Release - On Casting of 8th Floor Slab
Mar 2024 - Luminaire Block: Wing A - Milestone Release - On Casting of 8th Floor Slab
Mar 2024 - Luminaire Block: Wing A - Milestone Release - On Commencement of Flooring 1st to 5th floor
Mar 2024 - Luminaire Block: Wing A - Milestone Release - On Commencement of Flooring 1st to 5th floor
Mar 2024 - Luminaire Block: Wing A - Milestone Release - On Commencement of Flooring 1st to 5th floor
Mar 2024 - Luminaire Block: Wing A - Milestone Release - On Commencement of Flooring 1st to 5th floor
Mar 2024 - Krypton Block: Overall progress – Front view
Mar 2024 - Krypton Block: Overall progress – Front view
Mar 2024 - Krypton Block: Wing A
Mar 2024 - Krypton Block: Wing A
Mar 2024 - Krypton Block: Wing B
Mar 2024 - Krypton Block: Wing B
Mar 2024 - Krypton Block: Wing B - Glazing
Mar 2024 - Krypton Block: Wing B - Glazing
Mar 2024 - Krypton Block: Tiling works Finishes
Mar 2024 - Krypton Block: Tiling works Finishes
Mar 2024 - Krypton Block: UPVC Windows fixing Finishes
Mar 2024 - Krypton Block: UPVC Windows fixing Finishes
Mar 2024 - Krypton Block: Corridor painting and light fixtures Finishes
Mar 2024 - Krypton Block: Corridor painting and light fixtures Finishes
Mar 2024 - Krypton Block: Lift cladding Finishes
Mar 2024 - Krypton Block: Lift cladding Finishes
Jan 2024 - Krypton Block: Central Podium hardscape work in progress
Jan 2024 - Krypton Block: Central Podium hardscape work in progress
Mar 2024 - Krypton Block: Internal Flats - Doors Finishes
Mar 2024 - Krypton Block: Internal Flats - Doors Finishes
Mar 2024 - Krypton Block: Basement VDF/IPS Works Finishes
Mar 2024 - Krypton Block: Basement VDF/IPS Works Finishes
Mar 2024 - Krypton Block: Basement painting works Finishes
Mar 2024 - Krypton Block: Basement painting works Finishes
Mar 2024 - Krypton Block: Terrace floor tile works Finishes
Mar 2024 - Krypton Block: Terrace floor tile works Finishes
Mar 2024 - Jasper Block: External painting work is in progress
Mar 2024 - Jasper Block: External painting work is in progress
Mar 2024 - Jasper Block: Wing A - Finishing Works in progress
Mar 2024 - Jasper Block: Wing A - Finishing Works in progress
Mar 2024 - Jasper Block: Wing B - Finishing Works in progress
Mar 2024 - Jasper Block: Wing B - Finishing Works in progress
Mar 2024 - Jasper Block: External painting works in progress towards North & East elevation
Mar 2024 - Jasper Block: External painting works in progress towards North & East elevation
Mar 2024 - Jasper Block: Corridor finishing works in progress
Mar 2024 - Jasper Block: Corridor finishing works in progress
Mar 2024 - Jasper Block: Basement works completed
Mar 2024 - Jasper Block: Basement works completed
Mar 2024 - Jasper Block: Main entrance lobby finishing works in progress
Mar 2024 - Jasper Block: Main entrance lobby finishing works in progress
Mar 2024 - Jasper Block: Terrace clay tile work in progress
Mar 2024 - Jasper Block: Terrace clay tile work in progress
Mar 2024 - Jasper Block: Central podium landscaping works in progress
Mar 2024 - Jasper Block: Central podium landscaping works in progress
Mar 2024 - Iridium Block: Front Elevation
Mar 2024 - Iridium Block: Front Elevation
Mar 2024 - Iridium Block: Toilet sanitary fixtures and Toilet False ceiling works
Mar 2024 - Iridium Block: Toilet sanitary fixtures and Toilet False ceiling works
Mar 2024 - Iridium Block: QA certification flats and Corridor painting and tiling
Mar 2024 - Iridium Block: QA certification flats and Corridor painting and tiling
Mar 2024 - Iridium Block: Balcony and staircase tiling and railing works
Mar 2024 - Iridium Block: Balcony and staircase tiling and railing works
Mar 2024 - Iridium Block: north side elevation and ground floor car parking
Mar 2024 - Iridium Block: north side elevation and ground floor car parking
Mar 2024 - Iridium Block: Upper basement
Mar 2024 - Iridium Block: Upper basement
Mar 2024 - Iridium Block: Double height lobby glazing, tiling and false ceiling works
Mar 2024 - Iridium Block: Double height lobby glazing, tiling and false ceiling works
1/88

Get In Touch

Similar Projects

apartments in jakkur bangalore
Brigade Bricklane
Brigade Bricklane is a thoughtfully conceived low-rise complex that blends in modern ...
right arrow
View Details
luxury apartments in devanahalli bangalore
Brigade Orchards Luxury Apartments
A ten-minute drive from the airport, these apartments will be built with ...
right arrow
View Details
RERA STATUS:

Gallium at Brigade El Dorado: PRM/KA/RERA/1251/472/PR/190427/002540.
Helio at Brigade El Dorado: PRM/KA/RERA/1251/472/PR/190913/002889.
Jasper at Brigade El Dorado: PRM/KA/RERA/1250/303/PR/200618/003458
Feldspar at Brigade El Dorado: PRM/KA/RERA/1251/309/PR/210216/003909
Krypton at Brigade El Dorado: PRM/KA/RERA/1251/309/PR/210518/004158
Iridium at Brigade El Dorado: PRM/KA/RERA/1250/303/PR/200618/003458
Emerald at Brigade El Dorado: PRM/KA/RERA/1251/309/PR/190722/005089
Aurum at Brigade El Dorado: PRM/KA/RERA/1250/303/PR/230623/006018
Luminaire at Brigade El Dorado: PRM/KA/RERA/1251/309/PR/190722/005089
Dioro at Brigade El Dorado: PRM/KA/RERA/1251/309/PR/160224/006634


Available at https://rera.karnataka.gov.in

PRICE:

2 & 3 BHK: 75 Lakhs Onwards*

 

*T&C Apply

TYPE:

1, 2 and 3 Bedroom Homes

SUPER BUILT-UP AREA:

Gallium and Helio Blocks:
74 – 99 Sq.m (795 – 1068 Sq.ft)
Jasper Block:
69 – 145 Sq.m (740 – 1561 Sq.ft)
Feldspar Block:
74 – 99 Sq.m (795 – 1068 Sq.ft)
Krypton Block:
 68.75 - 145.06 Sq.m (795 – 1401 Sq.ft)
Iridium Block
48.40 - 64.07 Sq.m (521 - 690 Sq.ft)
Emerald Block
87.13 - 128.43 Sq.m (938 - 1382 Sq.ft)
Aurum Block
87.13 - 145.06 Sq.m (938 - 1561 Sq.ft)
Luminaire Block
87.13 - 145.06 Sq.m (938 - 1561 Sq.ft)

CARPET AREA:

Gallium and Helio Blocks:
43 – 60 Sq.m (466 – 643 Sq.ft)
Jasper Block:
43 – 93 Sq.m (466 – 996 Sq.ft)
Feldspar Block:
43 – 60 Sq.m (463 – 646 Sq.ft)
Krypton Block:
43.32 – 92.58 Sq.m (466– 996 Sq.ft)
Iridium Block
30.40 - 40.29 Sq.m (327 - 434 Sq.ft)
Emerald Block
54.96 - 82.02 Sq.m (592 - 882.85 Sq.ft)
Aurum Block
54.96 - 92.58 Sq.m (592 - 996 Sq.ft)
Luminaire Block
54.96 - 92.58 Sq.m (592 - 996 Sq.ft)

Note: (1 Sq.m = 10.764 Sq.ft)

Features

10-acre Central Park, Swimming Pools, Two Clubhouses, Kid's Play Area, Open-air Amphitheatre, Football Field, Community Gardening, Multipurpose Hall, Creche, Cricket Ground, Convenience Store, Gym
ADDRESS:

Aerospace Park, Near Shell Office,
Huvinayakanahalli, Bengaluru,
Karnataka 562 149.

Social Infrastructure Nearby

Shell Research Centre 3 Kms
SAP 9 Kms
Kempegowda International Airport 11 Kms
Yelahanka 12 Kms
Thanisandra 15 Kms
Budigere Cross 16 Kms
Manyata Tech Park 17 Kms
Hebbal 20 Kms

Share

Similar Projects

apartments in jakkur bangalore
Brigade Bricklane
Brigade Bricklane is a thoughtfully conceived low-rise complex that blends in modern ...
right arrow
View Details
luxury apartments in devanahalli bangalore
Brigade Orchards Luxury Apartments
A ten-minute drive from the airport, these apartments will be built with ...
right arrow
View Details
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Click to call Click To Call